Manufacturing & industrial

Know what you can make, what it costs, and when you can deliver.

Growth in a manufacturer shows up as a second building, a new line, a bigger backlog, and systems that were sized for the company you used to be. We build the ERP, data and infrastructure that let production, finance and the shop floor agree, and we stay to run them.

Operators who have run plant systemsWork phased to your build scheduleShop-floor machines handled with care
The gap

The backlog is growing. So is the spreadsheet.

Promise dates set by instinct. Costing that finance doesn't trust. An ERP that reflects the org chart instead of the production schedule. A new facility whose network and standards are an afterthought until the week before move-in.

ERP and production planning

Built around how production actually runs so promise dates mean something.

Costing and inventory

Material, labor and overhead you can report by product and by job. Inventory counts that match the system.

Facility expansion

The technology layer of a new building: network, physical security, standards, delivered on the construction schedule.

Operated infrastructure and security

Plant and office environments run to one standard, with machine-control PCs handled deliberately and the risk position reported monthly.

Exit and diligence readiness

For PE-backed manufacturers: documented, standardized, and ready for the buyer's data request.

Where it starts

A growth & systems assessment.

Four weeks. A fixed fee, quoted before any work starts. No changes to your environment. A written report and a roadmap, whether or not you continue.

The baseline looks at
  • ERP fit against how production runs today
  • Production-planning and promise-date visibility
  • Costing, inventory and reporting gaps
  • Infrastructure and security standards across sites
  • What the next facility or line will need, and when
How the baseline works

You can start with a baseline or go straight to the recurring engagement, a program or executive advisory, each under its own agreement. See the three offerings

Start with the production view.

Thirty minutes on what the ERP, the data and the infrastructure will need to carry the next stage of growth.